skip to main | skip to sidebar

Meany Hall Tech

Documenting our Lighting Project Upgrade

Monday, June 25, 2007

Pit Controller works fine

I don't know why but after all that the pit controller works fine throught the Stage Right wall receptacle.  So that is good and all we have to do is cap that off and say that the drawings were right and the added stuff just made it confusing without changing the original.
Posted by Meany Hall Carp at 9:09 AM

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Blog Archive

  • ▼  2007 (31)
    • ►  August (5)
    • ►  July (8)
    • ▼  June (18)
      • Yesterday was the ever exciting Wednesday meeting....
      • Here is a nice view of the stage today from the ba...
      • Cement walls
      • Pit Controller works fine
      • Pit Lift Controller
      • Oh thats why it wouldn't work
      • dimmer room is almost empty
      • yesterday the camera broke
      • Updating today, tomorrow aggresion will be had all...
      • now there is just the little 7 volt problem
      • 120 volts still in Stage Manger Panel
      • dimmer room
      • I just happened to love looking that the old techn...
      • The the floor pockets and all the wall circuits ar...
      • ETC shop Drawings...Please approve
      • Here is the beginning of the end of the Circuit Sl...
      • The beginnings no turning back now
      • Meany Hall Tech Blog

About Me

Meany Hall Carp
Seattle, Washington, United States
Meany Hall for the Performing Arts University of Washington- Public Performing Arts
View my complete profile